SPLOST 2011

On March 15, 2011 a referendum on a four-year SPLOST (Special Local Option Sales Tax) was approved by Cobb County voters. This program will be in effect from January 1, 2012 through December 31, 2015.

Mission Statement

Every project funded by the 2011 through 2015 SPLOST will improve the quality of life in the City of Austell by maintaining, improving, and enhancing transportation (new equipment, new sidewalks, and roadway resurfacing), parks, infrastructure, and public safety.

2011 Through 2015 SPLOST Budget Summary

Four year projected sales tax revenues: $4,672,186.00

Transportation: $2,803,312.00
Parks: $1,168,047.00
Public Safety: $700,828.00

Reports

2015 SPLOST Expenditure Summary
2014 SPLOST Expenditure Summary
2013 SPLOST Expenditure Summary
2012 SPLOST Expenditure Summary

SPLOST Logo
2016 SPLOST

Projects

Veterans Memorial Highway Sidewalk Connectivity

Project Number: SW-2015

Scope of Work: To construct a concrete barrier and connect existing sidewalk under overpass.

Status: Complete

Jefferson Street Drainage Improvements

Project Number: D2014-11

Scope of Work: To install approximately 595 linear feet of 18” RCP storm drainage pipe along with all related appurtenances.

Status: Complete

Greystone Place and Greystone Court Resurfacing

Scope of Work: Roadway resurfacing.

Project Limits: Sweetwater Valley Road to Dead End

Status: Complete

Greystone Court Curb and Gutter Replacement

Scope of Work: Curb and gutter removal and replacement.

Project Limits: Sweetwater Valley Road to Dead End

Status: Complete

Peco Lane Resurfacing

Scope of Work: Roadway resurfacing.

Project Limits: Humprhies Hill Road to Dead End

Status: Complete

Love Street Resurfacing

Scope of Work: Roadway resurfacing.

Project Limits: Douglas County Line to Jefferson Street

Status: Complete

Austell-Powder Springs Resurfacing

Scope of Work: Mill existing roadway, overlay with new asphalt, and thermoplastic striping.

Project Limits: Cureton Woods to Legion Park

Status: Complete

Austell-Powder Springs Sidewalks

Project Number: SW-1401

Scope of Work: Installation of new pedestrian sidewalk and drainage.

Project Limits: Cureton Woods to Legion Park

Status: Complete

Northview Drive Resurfacing

Project Number: PW-0813

Project Limits: Fessenden Avenue to Morningside Drive

Status: Complete

Cemetery Street Sidewalk Improvements

Project Number: PW-0713

Scope of Work: Increase connectivity between Bowden Street and Veterans Memorial Highway, this project Included the installation of approximately 1,600 linear feet of new four foot wide sidewalk. Additionally, drainage pipe and ADA accessibility ramps was installed where needed.

Project Limits: Bowden Street to Veterans Memorial Highway

Status: Complete

Sweetwater Street Resurfacing

Project Number: PW-0813

Project Limits: Austell Road to Cambrian Terrace

Status: Complete